Caravan Park Resurfacing
Resurfacing of the reception area and roads throughout Mortonhall Caravan Park.
The area was fully excavated and prepared with kerb edging and a Type 1 sub-base, with manholes set to the finished height. A 60mm AC20 base course was laid, followed by a 50mm AC10 Carpave Dense surface course, with all joints sealed using hot bitumen.